Loading...
Loading...
Blockchain-verified activity trail for all personnel actions
| Person | Action | Description | Aircraft | Hash | Status | |
|---|---|---|---|---|---|---|
Mar 9, 2026 02:32 PM UTC | John Martinez Lead Mechanic | Corrective Action | Replaced left main gear actuator seal. P/N: MS28775-214. Work order #WO-2843. | N48ZA | Anchored | |
Mar 9, 2026 01:15 PM UTC | Sarah Chen IA Inspector | Inspection | Annual inspection completed per §91.409. Aircraft returned to service. | N12AB | Anchored | |
Mar 9, 2026 11:48 AM UTC | Mike Rodriguez Pilot | Discrepancy | Right fuel gauge fluctuating during cruise. Intermittent indication between 1/4 and 1/2. | N48ZA | Sealed | |
Mar 9, 2026 10:22 AM UTC | Emily Watson Avionics Tech | Component Change | Installed new Garmin GNS 430W unit. S/N: 837291045. Replaced failed unit S/N: 729104837. | N77TR | Anchored | |
Mar 9, 2026 09:05 AM UTC | Admin System Admin | Anchored | Daily batch anchor completed. 12 records anchored. Merkle root published to Ethereum Sepolia. | ALL | Anchored | |
Mar 8, 2026 04:44 PM UTC | John Martinez Lead Mechanic | Timer Change | Updated Hobbs meter reading after post-maintenance engine run. New value: 2847.3 hrs. | N48ZA | Anchored | |
Mar 8, 2026 03:12 PM UTC | Sarah Chen IA Inspector | Record Sealed | Sealed corrective action record #CA-2841 to blockchain. Ed25519 signature applied. | N12AB | Sealed | |
Mar 8, 2026 02:05 PM UTC | Admin System Admin | Deferral | MEL deferral issued for inoperative cabin reading light. MEL 33-41-1, Cat C — 10 days. | N77TR | Sealed | |
Mar 8, 2026 11:33 AM UTC | Emily Watson Avionics Tech | Corrective Action | Repaired loose connector on VHF comm antenna feed line. COM 1 restored to full power. | N55QM | Anchored | |
Mar 8, 2026 10:18 AM UTC | Mike Rodriguez Pilot | Logbook Entry | Flight entry: KOSH to KRAC, 1.4 hrs dual, night VFR. 3 landings. Total time: 847.2 hrs. | N48ZA | Sealed |